Skip to main content

Connected by a rope - rope bridge construction

Connected by a rope

Rope bridge construction

Teamwork, logical thinking and time management

  • Which team finishes their bridge first?
  • Does it meet safety standards and was it completed on time?
  • Who has the most play money left at the end?

Everyone on the team is challenged!

Good way to establish links with cost planning and safety audits. We simulate the everyday life of a project.

Time required
3-4 hours

Requirements
No special knowledge needed. Everyone on the team can join in and put their skills to use.

Costs
From CHF 80 per person (depending on group size)

Location
Near the Susten Pass road in Gamden, which lies in the beautiful Haslital valley. Followed by a nice aperitif or a meal in the Alpine Center Sustenpass.

Seilbrückenbau
Seilbrücke als Teil der Strecke
An einem Strang ziehen beim Teamevent
Sieht schon recht stabil aus: Teamevent Seilbrückenbau

Book your accommodation now!